How Long Should it Take to Remodel a Bathroom in Los Angeles?

how long does it take to remodel a bathroom in Los Angeles

Getting ready to give your Los Angeles bathroom a makeover? If you are, you’re probably wondering how long the project will take. That’s a valid concern, especially if your home only has one bathroom or if you have a big family.

Each project is different. However, the average bathroom remodel in Los Angeles takes 3-6 weeks once construction begins. The timeline depends on the size of the space, complexity of the job and how quickly decisions are made. Let’s break it down so you can know what to expect and stay on track!

Bathroom Remodel Timeline: What to Expect Week by Week

When it comes to remodeling your bathroom, certain steps are always followed. At Carpet Wagon, we specialize in creating custom bathrooms in Los Angeles, and the process goes like this:

Pre-Construction (1-3 Weeks)

Before professional interior contractors start working on your bathroom, you have to do some planning. This tends to include the following:

  • In-home consultations and design decisions
  • Finalizing materials (tile, vanity, fixtures)
  • Permits (if required)
  • Ordering and waiting for product delivery

This stage shouldn’t be overlooked. Making thoughtful decisions early on can make for a smoother construction process down the line

  1. Demolition & Prep (1 Week)

The first step is knocking everything down to make room for your new bathroom. Old flooring, tile, cabinets and plumbing fixtures are removed. Subfloor and wall repairs are also completed as needed.

  1. Plumbing & Electrical (1 Week)

If your remodel requires plumbing or outlets, this is the time for it. Plumbers and electricians take care of the following:

  • Rough-in plumbing for showers, tubs, toilets and sinks
  • Electrical writing for lighting, fans and outlets

Note that inspections may be required before moving on to the next step.

  1. Installation & Finishes (2-3 Weeks)

The time has come. Things are finally starting to look like the bathroom of your dreams. Now it’s time for the final touches, including:

  • Installing flooring and wall tile
  • Mounting vanities, mirror and lighting
  • Painting, trim and final plumbing/electrical hookups
  • Installing the toilet and accessories like towel bars and shelving

Once all of the steps are completed, it’s almost time to enjoy your brand new bathroom.

  1. Final Walkthrough & Cleanup (1-2 Days)

Lastly, the licensed and insured contractors you hired will do a walkthrough, complete punch list fixes and cleanup. They also make sure everything is working and looks its best.

Factors That Can Impact Your Bathroom Remodel Timeline

Generally, bathroom remodeling projects take 3-6 weeks. However, a few aspects can speed up or delay your project. Let’s get into it.

Bathroom Size

How big is your bathroom? The size makes a difference. For example, a small powder room takes less time than a spacious master bath.

Scope of Work

Some bathroom updates are more complicated than others. Let’s compare:

  • Cosmetic Update (Paint, Fixtures, Flooring): These projects tend to take 1-2 weeks.
  • Full Gut Remodel: When the project involves changing the layout of the space, it takes longer.

Permits & Inspections in LA

Depending on the project, the city might require permits and inspections. If paperwork isn’t filed early and inspectors are backed up, your project might take longer.

Custom Materials or Special Orders

Customizing your bathroom is a great way to make a space your own. However, backordered tile, custom vanities or designer fixtures can push your project timeline out a few weeks.

Contractor Scheduling

Coordinating between trades (plumber, electrician, tile installer) is easier when you’re working with a unified. A contractor juggling multiple jobs or using subs who aren’t aligned can slow things down.

Start Your LA Bathroom Remodel Today

In terms of construction, a Los Angeles bathroom remodel can take 3 to 6 weeks. You also have to take 1-3 weeks of planning into account. The total timeline from consultation to completion ranges from 5 to 9 weeks depending on the decision making process and the project complexity.

At Carpet Wagon, we bring the showroom to you. Our shop-at-home service, in-home consultations and reliable remodeling team let you enjoy your new bathroom sooner. 
Ready to give your bathroom a makeover? Contact us to book a shop-at-home appointment today!

CONTACT US
Scroll to Top